
The Falls Church Bathroom Renovation
A dated bathroom that needed to be taken back to the framing. The owners wanted a room that would still look current in a decade, built with the waterproofing done properly rather than covered over.
We documented every phase of this project, from structural framing through precision tile installation to the final finishing and custom design elements. The wet area was rebuilt and re-waterproofed from the substrate up, the tile layout was set out before anything was fixed, and every detail was handled with care to ensure lasting results and visual appeal.
The same space, mid-build and finished


Drag to compare the room mid-build with the finished space.




We have just finished a remodeling of our bathroom. We are very pleased with work done by Dzala. The team is very professional and easy to work with.

Let's get started.
Tell us about your property and what you would like to change. We will review the details and follow up within one business day to arrange your free in-home consultation and written quote.
No obligation and no sales pressure. Your information stays with us.
